Menu
Cart (0)

You have no items in your shopping cart.

Subtotal: US$0.00
DK

Mining Infrastructure

12d Solutions is a software developer specialising in civil engineering and surveying solutions. The first version of 12d Model was released in 1991, both visionaries had worked in the industry for many years and found that the solutions on offer simply were not the most user friendly and that a true customer focus was lacking.

Today, we are proud to say that 12d Model is used in over 65 countries worldwide and our licenses are still growing. It is a solution that can be used by small businesses and individual consultants, through to large organisations.

What’s New

12d Overview

Convallis quis ac lectus donec rutrum congue leo eget malesuada vivamus eget suscipit tortor porttitor volutpat vivamus magna justo, lacinia eget consectetur convallis.

Task Management Seminar

Convallis quis ac lectus donec rutrum congue leo eget malesuada vivamus eget suscipit tortor porttitor volutpat vivamus magna justo, lacinia eget consectetur convallis.

Timeline Visualisation

Convallis quis ac lectus donec rutrum congue leo eget malesuada vivamus eget suscipit tortor porttitor volutpat vivamus magna justo, lacinia eget consectetur convallis.

Why 12d?

Mining Infrastructure

12d Model’s powerful set of exploration, site investigation, survey and analysis tools are crucial for the initial design, construction and ongoing operation of mining projects.

Comprehensive tools for the survey, design and construction of access roads, railways, earthworks and services allow for the coordinated design and management of mining infrastructure from within 12d Model.

Key Features

Expert Advice

Earthworks

Carry out earthwork design and analysis. Created staged designs or combine using the “SuperTIN” capabilities of 12d Model. Develop mass haul diagrams and other project documentation.

Expert Advice

Volume Calculations

Multiple volume reporting options including length, area and exact methods.

Expert Advice

Geotechnical

12d Model can be used to illustrate borehole data and analyse volumes of excavated material from differing soil conditions.

Expert Advice

Mine civil infrastructure design

12d can be used to design tailings ponds, mining pit, channels, hardstands and numerous other elements of mine civil infrastructure.

Expert Advice

Visualisation and presentation

The 3-D design is automatically/continuously created and can be viewed at any stage of the design process to provide instant real life representation of the project. Walk and drive through the design with options to record the drive as a movie to share with clients and other stakeholders.

Expert Advice

Project documentation

Automate the production of reports and drawings (plans, cross-sections and long-sections) and reduce drafting times.