Client | Westfield Shoppingtowns (UK) Ltd | Location |
White City, London, W12 |
Designer |
Watermans Transport & Development Ltd |
Contractor | Westfield Shoppingtowns (UK) Ltd |
Contract Value |
£1.6bn |
Completion Date |
30th October 2008 |
Outline:
The project is Europe's largest shopping centre and included the design of a major public transport interchange with new rail, underground and bus stations connecting directly to the centre.
The design also provided a new access road from the A3220 trunk road, a new Bus Station, two new railway stations and re-siting the Central Line Railway depot to accommodate a major new shopping mall with leisure facilities.
Background:
The project was conceived to regenerate the White City area and benefit the region by providing a commercial development with good transport links. It also provides improved facilities for the existing railways. It represents one of the bigger re-developments within the London area.
Methodology:
Feasibility studies were carried out to support the architects planning documents. Outline scheme options were developed using 12d model to demonstrate the horizontal and vertical components of the development were achievable.
Issues:
There were a number of underground obstacles and tunnels with minimal clearance above them which greatly influenced the vertical profile of the finished construction surfaces. The powerful design editing capacities of 12d allowed the design to be refined locally to overcome the issues by achieving the specified construction depths. The requirement to connect into several existing transportation links and preserve existing site features created obstacles for the horizontal alignment of the proposed highway network.
The flexible IP and complex element design alignment tools inside 12d enable alignments to meet on-site requirements while still achieving adoptable design standards and safety regulations. Flood protection measures were designed with aid of 12d analysis by integrating overflow paths into the highway designs.
The surface modeling functionality and analysis tools inside 12d significantly helped in determining the overflow paths and presenting them to all involved in the development.
- Learning Hub
-
-
Bluebeam
- FAQ
-
Case Studies
- Quantity Surveyor Calculates Takeoffs 70% Faster
- Electrical Contracting Firm CEI achieves for Faster, Clearer Project Communication
- Track projects 40% faster with real-time collaboration feature Bluebeam Studio
- 40,000 Drawings? No problem! - Karolinska Solna Project in Stockholm, Sweden
- Streamline the Delivery of Project Information Directly from BIM
- Award-winning architectural and planning firm saves $400,000 by switching to Bluebeam
- Video Resources
- Installation & Licensing
- Bidscreen
- Planswift
- TurboCAD
- 12d
- Industry Resources
-
Bluebeam